budAPest tHe FerenCVÁros storMwAter PuMPing stAtion BudaPest, hungaRy A reconstruction and capacity increase was necessary at the Ferencváros Pumping station in connection with the construction works at the budapest Central wastewater treatment Plant. if conditions are dry, 200,000 cubic meters of wastewater is pumped per day to the budapest Central wt P. However, the combined wastewater system means that in the event of rain, stormwater had to be pumped directly into the danube river. PumPs installed kPl submersible propeller pump ‑
Download PDF file
Cookie policy